- Read the
governing documents.
- Please
plan ahead and allow up to 30 days for the DRC to give
approval (or disapproval) of a proposed improvement.
- We use a spreadsheet to track compliance with our
controlling documents. Please read this spreadsheet. It is
found here: DRC
Checklist April, 2024
- Download the DRC Application form, found here: ESR-DRC-Application.docx,
and fill it out. Then, mail it and the appropriate fee amount
to the DRC chairman. The check should be payable to "Elk
Stream Ranch POA". Please write "DRC Application Fee" on the
check. This can precede or be included with the
required drawings and supporting explanations sent to the DRC
Chair that are referenced below. Call or email the DRC chair
to verify the class of submittal and mailing address.
- Make 3 copies of the required drawings and supporting
explanations.
- Snail
mail or scan and email a copy to each Design Review Committee
(DRC) member.
|